Optimize Every Route,
Schedule, and Facility

DSC-3 solves vehicle routing, production scheduling, and network design problems in milliseconds — not hours.

83ms
TSP solve time
500+
Cities with time windows
30M
Variables at scale
5,907x
Cost advantage over quantum

Operations at Industrial Scale

Vehicle Routing

Optimizing routes for hundreds of vehicles across thousands of stops with time windows, capacity constraints, and dynamic conditions.

Production Scheduling

Job-shop and flow-shop scheduling with setup times, machine constraints, due dates, and multi-objective optimization requirements.

Supply Chain Design

Facility location, inventory positioning, and network flow optimization across global supply chains with uncertain demand.

Industrial-Grade Optimization

Vehicle Routing (VRP)

Multi-depot routing with time windows, capacity constraints, and priority stops. Solve TSP and VRP variants with millions of variables natively.

Production Scheduling

Job-shop and flow-shop scheduling as QUBO problems. Minimize makespan while respecting setup times, machine constraints, and due dates.

Facility Location

Warehouse placement and coverage optimization. Balance service levels, transportation costs, and capital expenditure across network configurations.

Supply Chain Network

Multi-echelon inventory optimization under demand uncertainty. Design resilient networks that minimize total cost of ownership.

Bin Packing & Loading

Container utilization and weight distribution optimization. Maximize load efficiency while respecting weight limits and stacking constraints.

Workforce Scheduling

Shift optimization with skill matching, labor regulations, and preference constraints. Minimize overtime while maintaining coverage requirements.

DSC-3 vs. Traditional Solvers

Problem DSC-3 (RTX 5070 Ti) OR-Tools Manual Planning
100-city TSP 8ms 1.2s 4+ hours
500-city VRP (time windows) 83ms 45s infeasible
1,000-city VRP (multi-depot) 320ms timeout infeasible

How It Works

1. Submit Problem

Send routing, scheduling, or network design problems via REST API. Define stops, vehicles, constraints, and objectives in standard formats.

2. GPU Optimization

DSC-3 maps your problem to QUBO matrices. Seven parallel solvers compete on GPU hardware to find the best solution.

3. Actionable Results

Receive optimized routes, schedules, or network designs with cost breakdowns, constraint satisfaction scores, and verification proofs.

NVIDIA Inception Powered by NVIDIA GPU computing through the Inception Program.

Talk to Our Manufacturing Team

See how DSC-3 can optimize your supply chain, routing, and production scheduling.

Request a Demo View Benchmarks